Showing posts with label new and rescued lumber. Show all posts
Showing posts with label new and rescued lumber. Show all posts

Friday, August 19, 2016

The Production Line - Cedar Birdhouse Models 9

Voila!

Premium western cedar slat birdhouses, among my favourites

Once I'd walked three white pine painted models (on stands and metal poles) to my storage area, I had room to spread out a bit inside the workshop. And I was finally able to finish off three western cedar models that had been waiting for attention for quite some time.

I added trim and perches, took a few pictures and walked them into storage as well. A good day's work, I say.

 I won't paint premium cedar roof slats

 This one comes with a free spatula!

 Free fork!

One roof slat can be removed to provide access for spring cleaning.
(Note the two screws on closest roof slat. )

Did I mention the free wooden spoon?

FYI - the body of the birdhouse is made up of eight cedar slats, each 6" wide, 2.5 inches tall and 0.5 inches thick. The 8 slats adhere to 4 corner posts (or a wooden skeleton) inside the body. The base is about 5" x 6" (30 sq. in. interior is a good size) and roof slats (8.5 x 2.75 x 0.5) are attached to 2 cedar triangles that are themselves affixed to the body. Not as complicated as it sounds.

FYI - Don't throw out yer wooden utensils. Call me : )

Please link to The Production Line - Cedar Birdhouse Models 8 

Photos GH

Monday, July 18, 2016

The Production Line - 15 Cedar Birdhouses

Four Batches, All in One Go

Set of 3 on the left - rescued western cedar boxes w pine roofs
Set of 3 in middle - red cedar faces w pine sides and roof slats

My next birdhouse sale will be held in late August, so for the next few weeks I will have several different goals in mind while working - in a relaxed manner - inside the workshop.

1. Finish 9 birdhouses (3 x 3 different models), i.e., add trim and paint

2. Deliver a finished squirrel house

3. Sand, assemble, paint and trim 6 additional (new, as of Saturday) red cedar models

4. Draft plans for three new projects. Details to follow

Squirrel house, centre - new and rescued (aged) pine barnboard
Set of 3 wren and chickadee houses on right - new red cedar 

Set of 6 houses - new red cedar for faces, roofs and sides. Smells good!

How does one relax when the temperature hits plus-30 inside the shop?

Turn on the big fan and play cool music!

More to follow.

Please link to The Production Line - 18 Birdhouses (6)

Photos GH

Saturday, July 16, 2016

The Squirrel Box (4)

A Few More Details

Now we be done!

I said it was done but I was wrong. I posted 'final' photos of a squirrel nesting box yesterday and within 30 seconds I realized I wanted to add two more details.... a railing for the balcony and a branch for the face.

The railing and trim are from lovely bits of Wortley Village lath

Okay, now I can say 'voila'.

: )

Please link to The Squirrel House (3)

Photos GH

Sunday, May 8, 2016

Basic Cedar and Barnboard 2

G. Harrison is busy as a bee. Please visit 'The Workshop' (blog) when time allows. The most recent post follows:

Assembly Line on the Go

"Red cedar faces and barnboard slats (for sides and roofs)"

Today was a very good day to stand outside and sand lumber. The breeze surely carried the dust all the way to Labatts Park!

Once I had the nail gun loaded, assembly time went by in a flash. Painting.... not as quick. I'm slow with a brush. And careful.

 "Barnboard sides and roofs look good whether painted or not"


"Coming up - a full-on trim day"

More to follow involving second coats and trim.

Please link to Basic Cedar and Barnboard 1  at 'The Workshop by G. Harrison'

Photos GH

Sunday, March 1, 2015

The Workshop - Log Cabins (3)

Cold Out, Warm In

 ["Oh, it's cold outside"]

["Inside - New world's record?"]

By some combined fluke of nature and modern technology I saw the temperature rise to almost 14 degrees yesterday in the shop. The sun was shining at the right angle, the heater was set to 'the highest of highs', I'd just had a big cup of coffee and my stomach was a small furnace - all contributing factors I am sure.

And, I was able to move the seven cabins along the trail toward completion.

 ["Three of four small cabins. And the last one is my favourite"]

 ["My fav has old logs made from an old, rescued fence"]

 ["Two of three larger cabins. I will likely paint one of them"]

 ["Old barnboard triangles front and back. Loverly, I say"]

["I may stain this roof, then varnish, to show off the knots and grain"]

Sure, they need a bit of trim. Maybe I'll have a full-on trim day by Tuesday.

Cheers!

: )

Link to The Workshop

Photos GH

Friday, February 27, 2015

The Workshop - Log Cabins (2)

Lots of Sanding

 ["Four log cabins w 5 by 5-inch base"]

One Log Cabin is made up of many small bits and pieces, e., 14 short logs, 14 long logs, a base, two triangles (one w entry hole), 4 roof slats, one ridge pole, a chimney and assorted pieces of trim. So, the job of measuring, cutting and sanding the pieces for 7 log cabins can easily take a part-timer like me 2 - 3 afternoons, 2 - 3 hours at a time. Not that i begrudge the time. I have the time. But I do begrudge the cold!

["Three larger log cabins with 5 by 6-inch base"]

["I found lovely barnboard for the two triangles on this birdhouse"]

The sanding is complete, so this afternoon I will be able to assemble this lovely batch of pine, barnboard and cedar birdhouses in a jiff, say, 2 - 3 hours at a relaxed, chilly pace.

PS the temperature went as high as 10 degrees Celsius yesterday inside half of the workshop. Downright balmy!

Link to The Workshop

Photos GH

Thursday, February 26, 2015

The Workshop - New Projects

Deadline - March 27

["Stock for three log cabins looks kinda shabby at the moment"]

I like starting new batches of birdhouses (checking stock, measuring, cutting and sorting is up my alley), e.g., at the moment, 7 log cabins from rescued cedar and pine, and 5 small red cedar models from leftover new lumber.

("Stock for four more cabins and five basic BHs"]

What at first looks like a pile of rubble will soon be birdhouses fit for kings and queens of the air. If ready by March 27 they will be on a sale table the very next day.

Link to The Workshop

Photos GH

The Workshop - Cedar Triplexes 12

The Heat is On

 ["Perches are almost finished"]

I've discovered how to turn the heat up in the workshop without popping fuses, so I can continue adding trim to three painted triplexes in relative comfort. I will now attach perches, windows, doors, hydro poles, fences, cats, mini-birdhouses, etc., without my hands turning blue.

["Lovely red cedar lasts a long, long time"]


["The fences will not be bare for long"]

Done by Friday. Yay!

And I've already started my next two projects... batches of beauties.

: )

Link to The Workshop

Photos GH

Saturday, February 21, 2015

Artsy Fartsy 18

Next Workshop Project

 ["Measurements and full-on trim ideas are ready to go"]

["How about a painted tree branch in place of a hydro pole?"

I feel I need to build 8 - 10 log cabin birdhouses before March 28 (date of my first local craft sale). I've got a diagram and exact measurements, plenty of  lumber and about five weeks before D - Day, i.e., Done Day.

I just hope it will warm up a bit or else I'll have to buy winter boots for the workshop that are wired for heat. Now there's a million-dollar idea for someone!

Link to Artsy Fartsy 17

Photos GH

The Workshop - Cedar Triplexes 11

Not Taking Forever

 ["The faint light indicates 'man at work'"]

["Ouch!"]

Eleven posts about cedar birdhouses? I must be the slowest worker this side of Lake Huron.

I'm slow, maybe. Definitely not the slowest. I mean, you've never met my Uncle Louie. He does laundry, like, once a year.

However, in my defence, the temperature only got as high as 5 C inside the shop yesterday, and while wearing mittens I find it hard to attach small bits of trim in rapid-fire fashion.

 ["One of six red cedar triplexes"]

 ["Three birdhouses all ready for line dancing. Add trim here, add trim there"]

["Next I will add perches, then attach fences"]

Speaking of fire. Today I will light a fire outside the shop to warm my hands up when times turn bitter. So, if you smell cedar smoke at 3PM, don't call 911.

Link to The Workshop

Photos GH

Friday, February 20, 2015

The Workshop - Cedar Triplexes 10

Slow and Steady


Sometimes, except for when I am rubbing my cold hands directly in front of the heater, working inside the shop is a lot like working outside. Brrrrrr. Baby, it's cold outside... and inside.

["The patient is on its back, ready for a wee bit of trim"]

That being said, I have developed a slow and steady approach to adding the full complement of trim to three painted triplexes. Why, by the middle of next week I will have three more cedar BHs finished and a new batch of log cabins underway.

Link to The Workshop

Photos GH

Wednesday, February 18, 2015

Birdhouse London - Cedar Triplex

Ready to Go

This red cedar birdhouse is 18 inches wide and 13 inches tall (attached to a 20" x 9.75" gray barnboard base) and with 1 3/8th" entry holes will make a lovely home for various small songbirds. I will build a support platform w pole for one of the six triplexes so folks can see at least one suitable way to put the sturdy beauties to work and on display. Stay tuned.

["The cat is on the prowl"]

["One free birdhouse with this model!"]

Link to more Birdhouse London (finished birdhouses ready for a spring sale)

Photos GH

Monday, February 16, 2015

The Workshop - Cedar Triplexes 9

Ready for Roofs, and Q & A


Amid the mess on my basement work table you will find three BHs ready for the next step. So, out they go today to the cold workshop.


I will tack on the roof slats, then start adding trim - and lots of it. All the while I will be wondering how much my hydro bill will be at the end of this cold month.

Q: Is the entry hole on the tall center unit too high from the base, i.e., more than 6 - 7 inches?

A: It appears so from the outside, but inside the tallest unit I included a raised bottom, 6 - 7 inches below the hole.

Q: So, with the false bottom, can the BH be cleaned out by removing the base?

A: No, but one of the roof slats will be screwed into place for easy removal. See side units for an example.

Any other questions? : )

Link to The Workshop

Photos GH

Saturday, February 14, 2015

The Workshop - Cedar Triplexes 8

Yellow Roof Top

["Second coat of bright yellow will be applied later this morning"]

I am on track to have six large BHs finished by middle of next week.

["Some trim and perches still required"]

Maybe I will add a lazy cat to each fence. And a wee birdhouse too.

Busy day ahead.

Link to The Workshop

Photos GH

Friday, February 13, 2015

The Workshop - Cedar Triplexes 7

Red Tops

["The basement workspace is warmer for my toes"]

Three of the triplexes will have painted roofs and three (still inside the cold backyard workshop) will be have natural cedar roofs. I think by the middle of next week most of the trim and paint work will be done and I'll be able to put on quite the show.

Stay tuned.

Link to The Workshop

Photo GH

Thursday, February 12, 2015

The Workshop - Cedar Triplexes 6

Trim the First Three


I am assembling quite a bit of trim for three large BHs. And I am ready to paint another three in the basement. (I chose a wee spot to paint inside the house because the paint would freeze overnight in the backyard shop).

Busy times.

Link to The Workshop

Photo GH

Wednesday, February 11, 2015

The Workshop - Cedar Triplexes 5

Safe on Base

 ["Six bases coming up next"]

Six triplexes reached a certain stage yesterday - main bits fully assembled except for the base.

["Four all done. The ones without roofs come indoors for paint"]

["Last two all done. No paint needed, just lots of trim"]

Adding a firm base is one of the easy jobs so I had them done before Coronation Street came on the tellie.

: ) Safe!

Link to The Workshop

Photos GH